Mid-install concrete S-tile re-roof in Madera Highlands, Sahuarita with Catalinas in background

Work/Underlayment swap — Madera Highlands

Underlayment swap — Madera Highlands

Madera HighlandsSahuarita2024

Service
Tile re-roof
Location
Madera Highlands, Sahuarita
Timeline
5 working days

The job

What this project actually was.

A 2005-built Madera Highlands home hitting the early end of the underlayment-failure window. Mid-install shot showing new Polystick TU MAX in place before the original tiles got relayed. Tiles were 95% salvageable; we sourced replacements only for the few that broke during careful removal. Five-day project from tear-off to walkthrough.

Materials —

  • Polystick TU MAX self-adhered modified bitumen
  • Original concrete S-tile (95% salvaged)
  • Polyglass MTS in valleys and details
  • Lead flashing at chimney transitions
Coronado Roofing crew laying concrete tile during a Sahuarita re-roof
Crew laying the salvaged tiles back down.

Get a project like this quoted.

Free drone inspection. Honest assessment. No pressure.

(520) 273-5626

Mon–Fri · 7am–5pm·Saturday by appointment

Last updated —